Storm Water Management Plan
|
||
The
Chico Unified School District (CUSD) has been included on the
California State Water Resources Control Board's (SWRCB) Storm Water
Permitting Requirements, Attachment 3, "Non-Traditional Small MS4s"
designation list as an operator of a Municipal Separate Storm Sewer
System (MS4). Inclusion on this list requires that CUSD prepare a Notice
of Intent (NOI) and a Storm Water Management Plan (SWMP) and submit
them to the local California Regional Water Quality Control Board
(RWQCB). Based on notification from the Central Valley RWQCB and/or the
SWRCB, in October 2008, CUSD prepared and submitted the required NOI and
SWMP consistent with the current SWRCB Phase II MS4 regulations and
guidelines. The SWMP outlined activities for the implementation period
2008 through 2012.
Under Phase II of this Small MS4 General Permit, operators of regulated small municipal separate storm sewer systems (MS4s) are required to (1) obtain coverage under the National Pollutant Discharge Elimination System (NPDES) Small MS4 General Permit, and (2) develop a storm water management program which includes implementation of the six minimum control measures: Please access the web link to view the CUSD Storm Water Management Plan. Click here to view the CUSD Storm Water Management Plan. |